Elevators Passenger 11 Maintenance
Contract(yes/no) Yes Freight 1 Maintenance
Contract(yes/no) Yes 8 Electric
Service Single or Dual
Feed Dual Volts 13200/480/208/120 Location of
Transformers Basement Quantitiy of
Transformers 2 Emergency Generator
- Location Basement - Testing Weekly - Gas #2 fuel oil - What is
serviced Elevators &
Emergency lighting 8 HVAC Chillers - Quantity 3 - Tonnage 350 each -
Manufacturer Trane - Fan
Systems Two per floor, east and
west - Zoning No - Perimeter induction
system 77-Convector
units/floor-2 pipe system
(heat/cool) - Energy Management
System Yes - Interior variable air
volume(VAV) No - Zoning No 8 Fire & Life
Safety Elevator
recall Yes Sprinkler Yes Strobes Yes Full ADA
Compliance n/a Smoke Purge
System No Floor
Loading 60 lbs. Stand Pipe Yes 8 Floor
Loading Bay size n/a Column
spacing n/a Finished Ceiling
Height 8'2" Less in some
areas. Slab to Slab n/a Core Offset n/a 8 Roof Type Rubber 8 Concourse Access Yes Moving Vans No 8 Improvements(past,present,future)
New Lobby |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||